We were on vacation for 9 days and while Geff had stopped by to check on the progress, this evening was the first time I had made it over to the house. The painters were still working on the outside when we arrived.
|
Painting on the outside has started |
The side with the garage door is in the process of being painted, the front side only has the paint samples.
We went in through the garage door into the hallway by the laundry room.
|
Laundry room floor |
The tile is a little darker than I had expected, but it seemed to anchor the room fairly well.
Then, we checked out the master bathroom. It took me a minute to realize that the orange material was the floor heater.
|
In front of what will be the vanity |
|
A view of their progresss |
|
Looking toward the toilet area |
I think I am going to be really happy when winter comes to have the floor heater.
In the main room, the paint samples for the inside and stacks of hardwood flooring waited for us.
|
The four paint samples for the trim and walls |
|
A stack of hardwood acclimating to the climate |
Other progress updates:
|
The floor in the second bathroom now has its grade |
|
The frame for the front door |
|
The tile for the master shower |