So many projects....so little time. So many more projects to start.
Saturday, October 21, 2023
The Cabinets Have Arrived! - September 2, 2023
Friday, October 20, 2023
Checking in on the Progress - August 27, 2023
Progress with the Tiling - August 13, 2023
I am way behind updating this blog, although fortunately I am not too far behind in taking photos.
![]() |
| The tiles in the master bath |
![]() |
| Marge's shower |
Checking in on the Progress - August 6, 2023
Sometimes, we see things (that the builder goes ahead and fixes) that just make us twinge. On this particular day, it was the downspouts...
| A trailer was still on this downspout :( |
But, the hardwood floors sure made up for the disappointment of the carelessness with the downspots:
Friday, July 28, 2023
Feeling More Like Our Home
It has been fun watching the progress, but up until now, it has felt more generic. Now, some of our personal choices are starting to be visible. First up, is the front door. Yes, it will be cleaned up yet, but the door from the old house is now in place in our new house:
![]() |
| Our new front entrance |
![]() |
| I like the stonework |
Inside, the vinyl flooring option that we picked for those rooms that need more water-proof flooring has a sample available:
![]() |
| Vinyl flooring options |
Jumping around a little bit, the deck just needs a railing and the stairs:
![]() |
| Master Shower |
And, more of the hardwood flooring has been put down:
Paint, a Front Door, and More Flooring
The exterior paint looks finished:
The front door is in place:
And, more flooring has been laid down:
Thursday, July 13, 2023
Starting the Flooring & Painting
We were on vacation for 9 days and while Geff had stopped by to check on the progress, this evening was the first time I had made it over to the house. The painters were still working on the outside when we arrived.
![]() |
| Painting on the outside has started |
The side with the garage door is in the process of being painted, the front side only has the paint samples.
We went in through the garage door into the hallway by the laundry room.
![]() |
| Laundry room floor |
The tile is a little darker than I had expected, but it seemed to anchor the room fairly well.
Then, we checked out the master bathroom. It took me a minute to realize that the orange material was the floor heater.
![]() |
| In front of what will be the vanity |
![]() |
| A view of their progresss |
![]() |
| Looking toward the toilet area |
I think I am going to be really happy when winter comes to have the floor heater.
In the main room, the paint samples for the inside and stacks of hardwood flooring waited for us.
![]() |
| The four paint samples for the trim and walls |
![]() |
| A stack of hardwood acclimating to the climate |
Other progress updates:
![]() |
| The floor in the second bathroom now has its grade |
![]() |
| The frame for the front door |
![]() |
| The tile for the master shower |
Finally Getting Back to the Hobbies
Once the sod was in, time sped up for a while. We soon found ourselves in the new house, but having to wait for the certificate of occupanc...
-
For some reason, I never got around to posting the photos that I took last weekend. I will hopefully get those posted in the next few days ...
-
Item 19 on the list to the right is the Flannel Elk Quilt. This has been a vague concept since I found the following flannel in what was on...
-
I decided to do a modified log cabin pattern with the fabric that I purchased for the butterfly quilt. It is basically a log cabin with a v...



































