Monday, June 26, 2023

The Start of the Back Deck

 Saturday afternoon, we stopped by the new house to check out the most recent updates.  The exciting update this week was seeing the back deck start to take shape:

Geff sitting on the deck



While we were there, I got a few other photos.  For some reason, I hadn't gotten any photos of the front office once the drywall had gone up.

Front Office

I'm waiting to see the tiling start in the master bathroom.  I'm hoping it looks close to what I'm picturing in my head.


Master bath

The deck looks good from the master bedroom, too.

View of the deck from the master bedroom

And, I still love the fireplace.

Fireplace

Tuesday, June 20, 2023

Brick Work and Mechanical Updates

 We were busy all weekend with events at opposite ends of the state, so we decided to stop by the house this evening after work. Most of the updates were either with the installation of the rocks or the hydromechanical HVAC system. There was signs where they had drilled in the back and some fancy piping in the basement. 

And  then there was the fireplace and front entrance. 

The fireplace is coming along 

Prepping for the brick work 

Monday, June 12, 2023

A Nod to the Past

 When we were cleaning out the old house, we both realized that the front door was in really great shape, especially considering the age of it.  After talking about, we decided to put the door into storage in case it would be possible to use it for the new house. 

A month ago or so, the builder and his door person met Geff at the storage unit to check the door. Fortunately, they agreed that the door itself was in good shape and could be re-used in our new house. 

Sunday, we pulled the door out of storage and brought it to the new house. 

Outside of the Door 



Inside of the Door 

We even found a piece of the glass that had originally been in the door and were able to save it. 

Stained Glass


Back Deck Footings

The cement crew must have been back. When we walked around to the backyard, we noticed that the footings for the back deck had been poured.

Footings for the Back Deck 

And, the outside paint samples were there:

Paint Samples 



Inside Updates

We stopped by the house on Sunday and took a quick look at the most recent updates.  The most obvious update is the work on the fireplace.   

The fireplace is coming along 

They are using the same rocks for the fireplace as they are using for the outside trim:

Outside Trim

Less obvious was the work being done in the closets.

Office Closet

Now, personally, seeing the shelves in the office made me happy. I can already picture the shelves loaded with fabric. 

Master Closet 2

Master Closet 1

Other updates were the prep work taking place for the tile and flooring throughout. 

Prepping for the tile in the second bathroom 

I almost forgot: we have internal doors and trim:

Master Bathroom Door 


Secondary Bathroom and Bedrooms

They are also making great progress on the secondary bathroom and the other two bedrooms. 

This first set of photos were taken on May 26.

Bedroom 3

The closet in bedroom 2

Bedroom 2

The shower in the second bathroom

The second bathroom is basically ADA compliant. In the photo above, the toilet will be to the left of the shower bench.  There will be a gradual ramp up to the middle of the toilet and shower area and then it will ramp back down into the shower so that a wheelchair can be rolled into the shower area, if needed.

The vanity area of the second bathroom, looking toward bedroom 3

This next set of photos were taken on May 20th.  The first two are of the shower area.  We were trying to get an idea of how much tile we needed to purchase



This next photo is in bedroom 3, which is where we had a dog door installed.  The boys definitely would not be happy not being able to go in and out on their own.


This next set of photos were taken on April 27, after the insulation had gone up on the walls.

This is actually the hall that looks into the garage

This is Bedroom 2

Second Bathroom shower

Second bath vanity area, looking toward bedroom 3

Second bath vanity area

And, this last set of photos is from April 9th:

Second bathroom shower

Second bathroom shower

Second bathroom shower bench

Second bathroom shower bench

Under the window in bedroom 3

The northeast corner of bedroom 3

Another view of the northeast corner of bedroom 3

Bedroom 3

Bedroom 3


The Front Office

I have been focused on other areas of the house and have forgotten to take pictures of the front office now that the drywall is up.  Oops!

Here are two photos, though, from April 27 when the insulation had just been added.



And, these next photos show some of the framing and wiring that was in place on April 9:





The Basement

On May 29, we decided to see how the basement was faring with all the recent rain. The good news is that the basement was dry. 

This is going to be a huge storage area. 

The northwest corner of the basement 


The north wall of the basement 

This was how the stairwell was looking on May 20th:

Stairwell on 5/20

On April 27, the stairwell had just the insulation in place:

Stairwell on 4/20

On April 16, we met our builder over at the new house.  These photos from the basement were taken that day.

The space on the left will be the mechanical room and access to the crawl space

This next photo is from inside what will be the mechanical room, with the access to the crawl space.

Access to the crawl space

The ceiling in the mechanical room

The crawl space itself

The west wall and the basement ceiling

Another view of the west wall and ceiling

Another view of the ceiling, looking toward the north east corner

And, before that, the basement looked like the following photos on April 9th:




The Turf Makes a Huge Difference

 I'm finally caught up on older posts.  I took this photo this morning, just after the front lawn had been put in.  I'm loving it.