They are also making great progress on the secondary bathroom and the other two bedrooms.
This first set of photos were taken on May 26.
|
Bedroom 3 |
|
The closet in bedroom 2 |
|
Bedroom 2 |
|
The shower in the second bathroom |
The second bathroom is basically ADA compliant. In the photo above, the toilet will be to the left of the shower bench. There will be a gradual ramp up to the middle of the toilet and shower area and then it will ramp back down into the shower so that a wheelchair can be rolled into the shower area, if needed.
|
The vanity area of the second bathroom, looking toward bedroom 3 |
This next set of photos were taken on May 20th. The first two are of the shower area. We were trying to get an idea of how much tile we needed to purchase
This next photo is in bedroom 3, which is where we had a dog door installed. The boys definitely would not be happy not being able to go in and out on their own.
No comments:
Post a Comment
Thank you for your comment!