We were busy all weekend with events at opposite ends of the state, so we decided to stop by the house this evening after work. Most of the updates were either with the installation of the rocks or the hydromechanical HVAC system. There was signs where they had drilled in the back and some fancy piping in the basement.
And then there was the fireplace and front entrance.
The fireplace is coming along |
Prepping for the brick work |
No comments:
Post a Comment
Thank you for your comment!